Select a plant from the dropdown above to view its performance detail and organisation history.
The costs in this report are derived from data published on the EPİAŞ Transparency Platform. They reflect the financial value, as imbalance charges and KÜPST, of the difference between each plant's final production plan (KUDÜP) and its settled generation (UEVM). This cost does not depend on forecast performance alone: nomination strategy, portfolio management decisions, maintenance and outages, curtailment and balancing instructions (YAL/YAT) and system direction all shape the final figure, and public data cannot separate these effects. The report is therefore not, on its own, a sufficient basis for assessing the performance of individual plants or portfolios.
284
Plants Reporting
3.11 GWh
Generation This Month
428.9 M TL
Imbalance Cost This Month
27.1%
Median Imbalance %
+0.2pp vs vs prev. month
164 TL/MWh
Sector Unit Cost
Plant Ranking – October 2026
| Plant | Imbalance (%) | Unit Cost (TL/MWh) | Generation (MWh) | Total Cost |
|---|---|---|---|---|
| ÖRLEMİŞ RES | 11.9% | 73.76 | 7,747 | 571,404 |
| Boreas 1 Enez RES | 12.0% | 72.69 | 9,127 | 663,406 |
| ALİAĞA BERGAMA RES | 12.6% | 92.15 | 25,358 | 2,336,601 |
| YUNTDAĞ RES | 13.6% | 88.64 | 14,031 | 1,243,669 |
| GAZİOSMANPAŞA RES | 14.2% | 71.93 | 15,682 | 1,128,020 |
| UYGAR RES | 14.3% | 78.80 | 69,378 | 5,466,854 |
| SOMA RES(BİLGİN ENR.) | 14.4% | 103.33 | 26,603 | 2,748,876 |
| İSTANBUL RES | 14.6% | 78.00 | 58,549 | 4,566,738 |
| HACI BEY RES | 14.9% | 90.37 | 18,832 | 1,701,887 |
| GERES RES | 15.1% | 87.42 | 7,209 | 630,256 |
| ATARES-2 RES | 15.2% | 93.04 | 34,751 | 3,233,090 |
| ALİBEY RES | 15.3% | 79.94 | 11,834 | 946,011 |
| BERGRES RES | 15.9% | 106.14 | 14,550 | 1,544,381 |
| ŞAPDAĞI RES | 15.9% | 90.94 | 10,133 | 921,475 |
| SÜLOĞLU RES | 16.0% | 100.02 | 22,510 | 2,251,485 |
| VİZE-2 RES | 16.3% | 103.49 | 25,748 | 2,664,616 |
| KARABURUN RES | 16.3% | 103.39 | 52,803 | 5,459,321 |
| ELMACIK RES | 16.6% | 110.19 | 24,056 | 2,650,857 |
| ÇATALCA RES | 17.3% | 95.79 | 21,351 | 2,045,106 |
| TEPERES | 17.7% | 108.72 | 1,832 | 199,137 |
| KIYIKÖY RES (TEKİRDAĞ) | 17.8% | 109.48 | 12,589 | 1,378,263 |
| BANDIRMA RES(BİLGİN GÜÇ) | 17.9% | 103.70 | 15,861 | 1,644,693 |
| ÖMERLİ RES(BETİM) | 18.0% | 98.96 | 26,594 | 2,631,664 |
| SİLİVRİ RES | 18.0% | 102.61 | 32,125 | 3,296,259 |
| AİRRES-4 RES | 18.3% | 113.97 | 33,081 | 3,770,239 |
| TATLIPINAR RES | 18.4% | 114.16 | 30,711 | 3,505,818 |
| Kavaklı RES | 18.4% | 134.65 | 11,059 | 1,489,050 |
| ADA-2 RES | 18.4% | 152.88 | 1,081 | 165,272 |
| ŞAH RES | 18.6% | 120.04 | 23,166 | 2,780,943 |
| DEMİRCİLİ RES | 18.6% | 123.84 | 8,369 | 1,036,424 |
| KINIK RES(ESİNTİ) | 18.7% | 105.90 | 11,715 | 1,240,658 |
| MORDOĞAN RES(EGENDA) | 18.9% | 139.40 | 3,224 | 449,488 |
| KIYIKÖY RES (KIRKLARELİ) | 18.9% | 111.09 | 25,123 | 2,790,966 |
| ÜÇPINAR RES | 18.9% | 111.75 | 30,952 | 3,458,904 |
| ÇANDIR RES | 19.2% | 104.07 | 4,075 | 424,071 |
| SOMA RES(SOMA ENR.) | 19.2% | 149.61 | 40,521 | 6,062,354 |
| KANİJE RES | 19.3% | 103.20 | 16,246 | 1,676,641 |
| SEYİTALİ RES | 19.5% | 146.51 | 7,341 | 1,075,531 |
| İÇDAŞ BİGA RES | 19.6% | 129.01 | 12,904 | 1,664,811 |
| ZELİHA RES | 19.7% | 125.41 | 5,816 | 729,440 |
| AKHİSAR RES | 19.8% | 135.27 | 10,771 | 1,457,040 |
| POYRAZ RES(NM ENR.) | 20.0% | 126.81 | 6,355 | 805,833 |
| ARMUTÇUK RES | 20.0% | 106.76 | 19,949 | 2,129,800 |
| ÇATALTEPE RES(SÜPER ELK.) | 20.0% | 123.36 | 3,361 | 414,665 |
| GELİBOLU RES | 20.0% | 106.00 | 5,782 | 612,921 |
| MARMARA RES | 20.0% | 108.19 | 3,015 | 326,169 |
| URLA RES | 20.3% | 133.11 | 2,822 | 375,686 |
| YENİKÖY RES(MUTLU) | 20.3% | 107.40 | 16,854 | 1,810,200 |
| AYDOS RES | 20.3% | 110.18 | 5,179 | 570,584 |
| BURGAZ RES | 20.4% | 128.29 | 3,449 | 442,487 |
Operators who believe a figure for their plant is incorrect can request a review through the Algopoly report page.
Notes on individual plants
These notes state what the published data shows about a plant's month. They do not explain why it happened, because public data cannot establish that.
- KOZBEYLİ RES: on 1 day(s) a forecast was published but there was little or no output.
- KEMERBURGAZ RES: most of this month's deviation from the published forecast occurred on three days (days 2, 14, 15).
- KÜREKDAĞI RES: on 2 day(s) a forecast was published but there was little or no output.
- KORKMAZ RES: on 1 day(s) a forecast was published but there was little or no output.
- AKBÜK RES(AYEN ENR.): on 1 day(s) a forecast was published but there was little or no output.
- KARADAĞ RES(GARET): most of this month's deviation from the published forecast occurred on three days (days 1, 15, 16).
- YILMAZ RES: on 1 day(s) a forecast was published but there was little or no output.
- HAVZA RES: on 1 day(s) a forecast was published but there was little or no output.
- ZİYARET RES: output this period was low compared with this unit's own recent level.
- GÖKDAĞ RES(İLETKEN ENR.): this is the first full period for this unit in the report.
- KUYULUKOYAK RES: on 1 day(s) a forecast was published but there was little or no output.
- SARITEPE RES: output this period was low compared with this unit's own recent level.
- ORHANLI RES: on 1 day(s) a forecast was published but there was little or no output.
- DATÇA RES: on 1 day(s) a forecast was published but there was little or no output.
- R3-YOZGAT-1 RES: on 1 day(s) a forecast was published but there was little or no output.
- KANDIRA RES: most of this month's deviation from the published forecast occurred on three days (days 15, 18, 19).
This dashboard is built on publicly available settlement data from EPİAŞ (Turkish Energy Exchange). The metrics below explain exactly how each figure is computed.
Data Source
All production, imbalance, and KÜPST figures are drawn from the EPİAŞ Real-Time Settlement (Gerçek Zamanlı Uzlaştırma / GZU) reports. Data is fetched at hourly resolution via the public EPIAS Transparency Platform REST API (eptr2) and aggregated to monthly plant-level summaries. The dataset covers all licensed solar (GES) or wind (RES) power plants that reported at least one hour of production in the analysis period.
Imbalance Ratio (%)
The imbalance ratio measures how much a plant's hourly generation deviates from its day-ahead schedule, relative to what it actually produced. For each hour we take the absolute difference between the forecast (KÜDÜP) and the actual settlement quantity (UEVM), sum these over the month, and divide by total actual generation:
Imbalance % = Σ |KÜDÜP − UEVM| (hourly) ÷ Σ UEVM (monthly) × 100
Because the hourly differences are taken in absolute value, over-production hours and under-production hours do not cancel out — both count as imbalance. The metric therefore captures hourly forecasting volatility and is scale-independent, so plants of different sizes compare fairly. The separate net imbalance (signed sum, where surplus and deficit hours offset) is typically much smaller and is reported as a distinct figure.Imbalance Cost
Imbalance cost arises when a plant's actual hourly generation differs from its day-ahead schedule. Settlement is system-direction-dependent: positive imbalance (plant produced more than scheduled) is settled on min(MCP, SMP); negative imbalance (produced less) on max(MCP, SMP).
- Until Dec 2025 — flat 3% margin: positive at min(MCP, SMP) × 0.97, negative at max(MCP, SMP) × 1.03.
- From Jan 2026 (EPDK regulation, Official Gazette 29/12/2025) — the margin depends on whether the plant's deviation aggravates or relieves the system. A deviation in the same direction as the system imbalance is charged 6% (positive × 0.94, negative × 1.06); a deviation that helps the system keeps the 3% margin (positive × 0.97, negative × 1.03).
KÜPST Cost
KÜPST (Kesinleşmiş Üretim Planından Sapma Tutarı — deviation-from-final-schedule charge) is a penalty applied hour by hour, whenever an hour's deviation from the final schedule (KUDÜP) exceeds a regulatory tolerance band set as a share of that hour's schedule:
- Solar (GES): 8% of the hour's KUDÜP (10% before Jan 2026)
- Wind (RES): 15% of the hour's KUDÜP (17% before Jan 2026)
Unit Cost (TL/MWh)
Unit cost = (Total Imbalance Cost + Total KÜPST Cost) ÷ Total Generation for the month, expressed in TL/MWh. It provides a scale-independent measure of settlement efficiency, allowing fair comparison across plants of different capacity.
Plant Rankings
Plants are ordered by their monthly imbalance percentage: the sum of absolute hourly differences between the published forecast (KUDÜP) and settled generation (UEVM), divided by generation, × 100. Hours do not offset each other. The figure reflects forecasting but also curtailment, outages and balancing instructions, which public data cannot separate, so it is not a measure of forecast skill alone. Differences between neighbouring plants are largely statistical noise, so the public table lists plants in order without rank numbers. Plants whose data does not allow a fair comparison (for example a partial month, very low generation, output far below the unit's usual level, or a day without a published forecast) are not ranked and are listed with the reason.
Coverage & Exclusions
A plant is excluded from a given month's ranking — while remaining in the registry — in either of these cases:
- Zero activity: the plant reported zero generation and zero forecast for the whole month.
- Insufficient forecast coverage: the plant has both a forecast and an actual value for less than half of the month's hours — typically a unit commissioned or registered mid-month. Its imbalance ratio would not be comparable with a full-month plant, so it is listed rather than ranked.
Plants excluded this month
| BOZCAADA RES | Zero production and zero forecast for the entire period — not ranked |
| MARMARA ADASI RES | Forecast and actual both available for only 33/744 hours — not comparable with a full-period plant, so not ranked |
| AKBÜK II RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| ALAÇATI RES(EÜAŞ) | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| EMRES RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| GAİA RES | This unit has fewer than 3 earlier months of settlement data. There is not yet enough history for a comparable monthly figure, so it is not ranked. |
| GELGİT RES | This unit has fewer than 3 earlier months of settlement data. There is not yet enough history for a comparable monthly figure, so it is not ranked. |
| KARABEL RES | On several days a forecast was published but there was little or no output, so the monthly ratio is not comparable with plants that ran throughout the period — not ranked |
| KORUDAĞI RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| Keltepe RES | On several days a forecast was published but there was little or no output, so the monthly ratio is not comparable with plants that ran throughout the period — not ranked |
| KİLLİK RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| MORDOĞAN RES(AYEN ENR.) | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| MİSKEVANK RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| PAŞALİMANI RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| SARAY DÖKÜM RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| SİNCİK RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| ÇEPNİ RES | This unit has fewer than 3 earlier months of settlement data. There is not yet enough history for a comparable monthly figure, so it is not ranked. |
| ŞENBÜK RES(YENİ BELEN ENR.) | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| ŞENKÖY RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |