Select a plant from the dropdown above to view its performance detail and organisation history.
The costs in this report are derived from data published on the EPİAŞ Transparency Platform. They reflect the financial value, as imbalance charges and KÜPST, of the difference between each plant's final production plan (KUDÜP) and its settled generation (UEVM). This cost does not depend on forecast performance alone: nomination strategy, portfolio management decisions, maintenance and outages, curtailment and balancing instructions (YAL/YAT) and system direction all shape the final figure, and public data cannot separate these effects. The report is therefore not, on its own, a sufficient basis for assessing the performance of individual plants or portfolios.
284
Plants Reporting
3.80 GWh
Generation This Month
505.5 M TL
Imbalance Cost This Month
26.9%
Median Imbalance %
+5.1pp vs vs prev. month
153 TL/MWh
Sector Unit Cost
Plant Ranking – September 2026
| Plant | Imbalance (%) | Unit Cost (TL/MWh) | Generation (MWh) | Total Cost |
|---|---|---|---|---|
| UYGAR RES | 9.7% | 56.91 | 123,158 | 7,008,366 |
| ÖRLEMİŞ RES | 11.0% | 64.24 | 12,446 | 799,498 |
| ŞAPDAĞI RES | 11.8% | 66.63 | 18,304 | 1,219,563 |
| SOMA RES(BİLGİN ENR.) | 12.0% | 83.68 | 47,979 | 4,014,931 |
| GERES RES | 12.1% | 69.45 | 14,387 | 999,158 |
| ALİBEY RES | 12.4% | 83.97 | 18,206 | 1,528,800 |
| İSTANBUL RES | 13.2% | 84.56 | 50,392 | 4,260,965 |
| YUNTDAĞ RES | 13.2% | 75.08 | 26,186 | 1,965,932 |
| TATLIPINAR RES | 13.7% | 86.77 | 48,156 | 4,178,434 |
| KARABURUN RES | 14.2% | 86.59 | 77,814 | 6,737,861 |
| ÜÇPINAR RES | 14.2% | 85.32 | 41,051 | 3,502,348 |
| OVACIK RES ÇANAKKALE | 14.6% | 90.59 | 22,903 | 2,074,752 |
| SOMA RES(SOMA ENR.) | 14.9% | 105.82 | 90,601 | 9,586,971 |
| VİZE-2 RES | 14.9% | 87.46 | 25,156 | 2,200,164 |
| YELDEĞİRMENİ RES | 15.4% | 106.64 | 2,734 | 291,596 |
| BERGRES RES | 15.4% | 96.70 | 23,694 | 2,291,180 |
| ARMUTÇUK RES | 15.7% | 103.88 | 31,672 | 3,290,001 |
| OVACIK RES İZMİR | 16.0% | 91.64 | 14,293 | 1,309,883 |
| HARMANCIK RES | 16.0% | 98.73 | 17,257 | 1,703,761 |
| GAZİOSMANPAŞA RES | 16.1% | 107.37 | 17,084 | 1,834,205 |
| GÜLPINAR RES | 16.1% | 99.92 | 55,487 | 5,544,093 |
| POYRAZ RES(NM ENR.) | 16.5% | 105.16 | 10,369 | 1,090,384 |
| SAROS RES | 16.5% | 109.95 | 55,946 | 6,151,525 |
| HACI BEY RES | 16.5% | 122.15 | 15,525 | 1,896,360 |
| AYDOS RES | 16.5% | 116.19 | 5,804 | 674,412 |
| ALİAĞA BERGAMA RES | 16.6% | 103.68 | 46,091 | 4,778,568 |
| YENİKÖY RES(MUTLU) | 16.7% | 116.31 | 21,929 | 2,550,675 |
| MARMARA RES | 16.9% | 113.93 | 4,062 | 462,754 |
| MORDOĞAN RES(EGENDA) | 17.0% | 102.78 | 5,077 | 521,808 |
| ATARES-2 RES | 17.0% | 112.25 | 45,275 | 5,082,282 |
| KOCALAR RES(ISIDER) | 17.0% | 113.09 | 19,333 | 2,186,339 |
| ÇATALCA RES | 17.1% | 112.27 | 23,338 | 2,620,221 |
| Kavaklı RES | 17.3% | 124.73 | 17,200 | 2,145,403 |
| ÇAYPINAR RES | 17.4% | 143.26 | 10,922 | 1,564,628 |
| MASLAKTEPE RES(ENİ) | 17.4% | 112.77 | 27,054 | 3,050,883 |
| ÖMERLİ RES(BETİM) | 17.6% | 102.61 | 28,934 | 2,968,808 |
| SUSURLUK RES | 17.6% | 132.40 | 24,211 | 3,205,652 |
| EVRENCİK RES | 17.9% | 112.66 | 50,002 | 5,633,273 |
| KINIK RES(ESİNTİ) | 18.0% | 91.36 | 20,980 | 1,916,698 |
| GAZİ-9 RES | 18.0% | 124.66 | 24,081 | 3,001,931 |
| AİRRES-4 RES | 18.0% | 119.95 | 31,104 | 3,730,962 |
| GELİBOLU RES | 18.1% | 113.14 | 8,308 | 939,884 |
| SÜLOĞLU RES | 18.6% | 100.05 | 15,367 | 1,537,507 |
| ŞENBÜK RES(YENİ BELEN ENR.) | 18.8% | 114.32 | 11,464 | 1,310,557 |
| ŞAH RES | 18.9% | 131.05 | 32,395 | 4,245,550 |
| BALIKESİR RES | 19.1% | 119.36 | 48,826 | 5,827,732 |
| Keltepe RES | 19.1% | 130.49 | 9,119 | 1,189,875 |
| GÖKTEPE RES | 19.4% | 153.58 | 36,492 | 5,604,430 |
| Boreas 1 Enez RES | 19.5% | 115.44 | 8,003 | 923,949 |
| ÇATALTEPE RES(SÜPER ELK.) | 19.8% | 130.12 | 3,597 | 468,031 |
Operators who believe a figure for their plant is incorrect can request a review through the Algopoly report page.
Notes on individual plants
These notes state what the published data shows about a plant's month. They do not explain why it happened, because public data cannot establish that.
- KIYIKÖY RES (TEKİRDAĞ): this is the first full period for this unit in the report.
- KIYIKÖY RES (KIRKLARELİ): this is the first full period for this unit in the report.
- GELGİT RES: this is the first full period for this unit in the report.
- GÖKZİRVE RES: output this period was low compared with this unit's own recent level.
- CERİT RES_(PAKMEM): on 1 day(s) a forecast was published but there was little or no output.
- KARLITEPE RES: output this period was low compared with this unit's own recent level.
This dashboard is built on publicly available settlement data from EPİAŞ (Turkish Energy Exchange). The metrics below explain exactly how each figure is computed.
Data Source
All production, imbalance, and KÜPST figures are drawn from the EPİAŞ Real-Time Settlement (Gerçek Zamanlı Uzlaştırma / GZU) reports. Data is fetched at hourly resolution via the public EPIAS Transparency Platform REST API (eptr2) and aggregated to monthly plant-level summaries. The dataset covers all licensed solar (GES) or wind (RES) power plants that reported at least one hour of production in the analysis period.
Imbalance Ratio (%)
The imbalance ratio measures how much a plant's hourly generation deviates from its day-ahead schedule, relative to what it actually produced. For each hour we take the absolute difference between the forecast (KÜDÜP) and the actual settlement quantity (UEVM), sum these over the month, and divide by total actual generation:
Imbalance % = Σ |KÜDÜP − UEVM| (hourly) ÷ Σ UEVM (monthly) × 100
Because the hourly differences are taken in absolute value, over-production hours and under-production hours do not cancel out — both count as imbalance. The metric therefore captures hourly forecasting volatility and is scale-independent, so plants of different sizes compare fairly. The separate net imbalance (signed sum, where surplus and deficit hours offset) is typically much smaller and is reported as a distinct figure.Imbalance Cost
Imbalance cost arises when a plant's actual hourly generation differs from its day-ahead schedule. Settlement is system-direction-dependent: positive imbalance (plant produced more than scheduled) is settled on min(MCP, SMP); negative imbalance (produced less) on max(MCP, SMP).
- Until Dec 2025 — flat 3% margin: positive at min(MCP, SMP) × 0.97, negative at max(MCP, SMP) × 1.03.
- From Jan 2026 (EPDK regulation, Official Gazette 29/12/2025) — the margin depends on whether the plant's deviation aggravates or relieves the system. A deviation in the same direction as the system imbalance is charged 6% (positive × 0.94, negative × 1.06); a deviation that helps the system keeps the 3% margin (positive × 0.97, negative × 1.03).
KÜPST Cost
KÜPST (Kesinleşmiş Üretim Planından Sapma Tutarı — deviation-from-final-schedule charge) is a penalty applied hour by hour, whenever an hour's deviation from the final schedule (KUDÜP) exceeds a regulatory tolerance band set as a share of that hour's schedule:
- Solar (GES): 8% of the hour's KUDÜP (10% before Jan 2026)
- Wind (RES): 15% of the hour's KUDÜP (17% before Jan 2026)
Unit Cost (TL/MWh)
Unit cost = (Total Imbalance Cost + Total KÜPST Cost) ÷ Total Generation for the month, expressed in TL/MWh. It provides a scale-independent measure of settlement efficiency, allowing fair comparison across plants of different capacity.
Plant Rankings
Plants are ordered by their monthly imbalance percentage: the sum of absolute hourly differences between the published forecast (KUDÜP) and settled generation (UEVM), divided by generation, × 100. Hours do not offset each other. The figure reflects forecasting but also curtailment, outages and balancing instructions, which public data cannot separate, so it is not a measure of forecast skill alone. Differences between neighbouring plants are largely statistical noise, so the public table lists plants in order without rank numbers. Plants whose data does not allow a fair comparison (for example a partial month, very low generation, output far below the unit's usual level, or a day without a published forecast) are not ranked and are listed with the reason.
Coverage & Exclusions
A plant is excluded from a given month's ranking — while remaining in the registry — in either of these cases:
- Zero activity: the plant reported zero generation and zero forecast for the whole month.
- Insufficient forecast coverage: the plant has both a forecast and an actual value for less than half of the month's hours — typically a unit commissioned or registered mid-month. Its imbalance ratio would not be comparable with a full-month plant, so it is listed rather than ranked.
Plants excluded this month
| BOZCAADA RES | Zero production and zero forecast for the entire period — not ranked |
| GAİA RES | Forecast and actual both available for only 182/720 hours — not comparable with a full-period plant, so not ranked |
| ALAÇATI RES(EÜAŞ) | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| ELMALI RES(ELMALI ENR.) | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| EMRES RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| FENER RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| GÖKDAĞ RES(İLETKEN ENR.) | On several days a forecast was published but there was little or no output, so the monthly ratio is not comparable with plants that ran throughout the period — not ranked |
| KORUDAĞI RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| KURTİNİ RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| KİLLİK RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| MADRANBABA RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| MİSKEVANK RES | Imbalance ratio above our 75% review threshold — not assessable from public data, so not ranked |
| ORHANLI RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| PAŞALİMANI RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| SARAY DÖKÜM RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| SEBENOBA RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| ÇEPNİ RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| ÇERKEŞ RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |