Select a plant from the dropdown above to view its performance detail and organisation history.
The costs in this report are derived from data published on the EPİAŞ Transparency Platform. They reflect the financial value, as imbalance charges and KÜPST, of the difference between each plant's final production plan (KUDÜP) and its settled generation (UEVM). This cost does not depend on forecast performance alone: nomination strategy, portfolio management decisions, maintenance and outages, curtailment and balancing instructions (YAL/YAT) and system direction all shape the final figure, and public data cannot separate these effects. The report is therefore not, on its own, a sufficient basis for assessing the performance of individual plants or portfolios.
287
Plants Reporting
4.72 GWh
Generation This Month
453.9 M TL
Imbalance Cost This Month
21.8%
Median Imbalance %
-2.9pp vs vs prev. month
112 TL/MWh
Sector Unit Cost
Plant Ranking – August 2026
| Plant | Imbalance (%) | Unit Cost (TL/MWh) | Generation (MWh) | Total Cost |
|---|---|---|---|---|
| ÖRLEMİŞ RES | 6.4% | 33.16 | 14,028 | 465,197 |
| UYGAR RES | 7.7% | 38.19 | 134,127 | 5,122,007 |
| SOMA RES(SOMA ENR.) | 9.2% | 49.65 | 114,505 | 5,685,637 |
| ALİBEY RES | 9.3% | 46.59 | 20,776 | 967,915 |
| SOMA RES(BİLGİN ENR.) | 9.5% | 51.97 | 54,077 | 2,810,577 |
| TATLIPINAR RES | 9.8% | 55.91 | 55,338 | 3,093,715 |
| YELDEĞİRMENİ RES | 10.4% | 65.94 | 2,966 | 195,597 |
| GERES RES | 10.4% | 61.35 | 15,619 | 958,193 |
| ÜÇPINAR RES | 10.9% | 62.44 | 47,459 | 2,963,460 |
| KARABURUN RES | 11.0% | 59.36 | 90,840 | 5,392,118 |
| ŞAPDAĞI RES | 11.2% | 67.78 | 18,698 | 1,267,380 |
| ŞENBÜK RES(YENİ BELEN ENR.) | 11.3% | 67.39 | 16,802 | 1,132,336 |
| BERGRES RES | 11.4% | 56.52 | 27,619 | 1,561,007 |
| ÇAYPINAR RES | 11.5% | 63.39 | 12,996 | 823,784 |
| SAROS RES | 11.7% | 63.74 | 67,150 | 4,279,878 |
| YUNTDAĞ RES | 11.8% | 63.19 | 28,591 | 1,806,609 |
| ALİAĞA BERGAMA RES | 12.1% | 66.40 | 53,951 | 3,582,085 |
| ARMUTÇUK RES | 12.2% | 69.10 | 37,969 | 2,623,469 |
| DEMİRCİLİ RES | 12.3% | 70.02 | 16,417 | 1,149,476 |
| Kavaklı RES | 12.5% | 72.98 | 21,305 | 1,554,715 |
| ATARES-2 RES | 12.6% | 76.76 | 51,214 | 3,931,047 |
| GAZİ-9 RES | 12.9% | 69.83 | 28,592 | 1,996,543 |
| SERTAVUL RES | 13.0% | 69.48 | 14,076 | 978,036 |
| SARITEPE RES | 13.2% | 79.01 | 25,612 | 2,023,733 |
| MORDOĞAN RES(EGENDA) | 13.6% | 75.66 | 5,492 | 415,559 |
| POYRAZ RES(NM ENR.) | 13.7% | 73.50 | 11,797 | 867,064 |
| OVACIK RES ÇANAKKALE | 13.8% | 66.34 | 24,900 | 1,651,994 |
| BALIKESİR RES | 13.9% | 60.47 | 59,330 | 3,587,470 |
| YENİKÖY RES(MUTLU) | 14.0% | 81.78 | 24,827 | 2,030,390 |
| KOCALAR RES(ISIDER) | 14.1% | 89.75 | 22,530 | 2,022,100 |
| HARMANCIK RES | 14.4% | 77.43 | 19,075 | 1,476,981 |
| GÖKÇEDAĞ RES | 14.4% | 75.29 | 39,674 | 2,986,854 |
| ŞAH RES | 14.6% | 86.98 | 38,412 | 3,341,207 |
| GELİBOLU RES | 14.7% | 78.28 | 10,770 | 843,071 |
| GÜLPINAR RES | 14.8% | 80.51 | 62,156 | 5,003,996 |
| OVACIK RES İZMİR | 14.9% | 77.75 | 15,435 | 1,200,144 |
| ATARES-1 RES | 15.0% | 86.81 | 29,670 | 2,575,552 |
| AKÇA RES | 15.0% | 77.84 | 13,990 | 1,088,942 |
| ZİYARET RES | 15.1% | 80.53 | 26,367 | 2,123,206 |
| MASLAKTEPE RES(ENİ) | 15.2% | 89.00 | 27,371 | 2,435,878 |
| KINIK RES(ESİNTİ) | 15.2% | 87.11 | 23,720 | 2,066,221 |
| AYDOS RES | 15.2% | 83.90 | 6,971 | 584,867 |
| Keltepe RES | 15.5% | 85.95 | 10,479 | 900,692 |
| MERSİN RES | 15.5% | 94.54 | 34,507 | 3,262,331 |
| GAZİOSMANPAŞA RES | 15.6% | 88.22 | 20,350 | 1,795,265 |
| SUSURLUK RES | 15.7% | 100.17 | 28,096 | 2,814,441 |
| HACI BEY RES | 15.7% | 94.50 | 18,673 | 1,764,590 |
| URLA RES | 15.8% | 83.93 | 4,706 | 395,009 |
| GEYCEK RES | 16.0% | 102.45 | 52,525 | 5,381,429 |
| VİZE-2 RES | 16.1% | 79.07 | 33,702 | 2,664,848 |
Operators who believe a figure for their plant is incorrect can request a review through the Algopoly report page.
This dashboard is built on publicly available settlement data from EPİAŞ (Turkish Energy Exchange). The metrics below explain exactly how each figure is computed.
Data Source
All production, imbalance, and KÜPST figures are drawn from the EPİAŞ Real-Time Settlement (Gerçek Zamanlı Uzlaştırma / GZU) reports. Data is fetched at hourly resolution via the public EPIAS Transparency Platform REST API (eptr2) and aggregated to monthly plant-level summaries. The dataset covers all licensed solar (GES) or wind (RES) power plants that reported at least one hour of production in the analysis period.
Imbalance Ratio (%)
The imbalance ratio measures how much a plant's hourly generation deviates from its day-ahead schedule, relative to what it actually produced. For each hour we take the absolute difference between the forecast (KÜDÜP) and the actual settlement quantity (UEVM), sum these over the month, and divide by total actual generation:
Imbalance % = Σ |KÜDÜP − UEVM| (hourly) ÷ Σ UEVM (monthly) × 100
Because the hourly differences are taken in absolute value, over-production hours and under-production hours do not cancel out — both count as imbalance. The metric therefore captures hourly forecasting volatility and is scale-independent, so plants of different sizes compare fairly. The separate net imbalance (signed sum, where surplus and deficit hours offset) is typically much smaller and is reported as a distinct figure.Imbalance Cost
Imbalance cost arises when a plant's actual hourly generation differs from its day-ahead schedule. Settlement is system-direction-dependent: positive imbalance (plant produced more than scheduled) is settled on min(MCP, SMP); negative imbalance (produced less) on max(MCP, SMP).
- Until Dec 2025 — flat 3% margin: positive at min(MCP, SMP) × 0.97, negative at max(MCP, SMP) × 1.03.
- From Jan 2026 (EPDK regulation, Official Gazette 29/12/2025) — the margin depends on whether the plant's deviation aggravates or relieves the system. A deviation in the same direction as the system imbalance is charged 6% (positive × 0.94, negative × 1.06); a deviation that helps the system keeps the 3% margin (positive × 0.97, negative × 1.03).
KÜPST Cost
KÜPST (Kesinleşmiş Üretim Planından Sapma Tutarı — deviation-from-final-schedule charge) is a penalty applied hour by hour, whenever an hour's deviation from the final schedule (KUDÜP) exceeds a regulatory tolerance band set as a share of that hour's schedule:
- Solar (GES): 8% of the hour's KUDÜP (10% before Jan 2026)
- Wind (RES): 15% of the hour's KUDÜP (17% before Jan 2026)
Unit Cost (TL/MWh)
Unit cost = (Total Imbalance Cost + Total KÜPST Cost) ÷ Total Generation for the month, expressed in TL/MWh. It provides a scale-independent measure of settlement efficiency, allowing fair comparison across plants of different capacity.
Plant Rankings
Plants are ordered by their monthly imbalance percentage: the sum of absolute hourly differences between the published forecast (KUDÜP) and settled generation (UEVM), divided by generation, × 100. Hours do not offset each other. The figure reflects forecasting but also curtailment, outages and balancing instructions, which public data cannot separate, so it is not a measure of forecast skill alone. Differences between neighbouring plants are largely statistical noise, so the public table lists plants in order without rank numbers. Plants whose data does not allow a fair comparison (for example a partial month, very low generation, output far below the unit's usual level, or a day without a published forecast) are not ranked and are listed with the reason.
Coverage & Exclusions
A plant is excluded from a given month's ranking — while remaining in the registry — in either of these cases:
- Zero activity: the plant reported zero generation and zero forecast for the whole month.
- Insufficient forecast coverage: the plant has both a forecast and an actual value for less than half of the month's hours — typically a unit commissioned or registered mid-month. Its imbalance ratio would not be comparable with a full-month plant, so it is listed rather than ranked.
Plants excluded this month
| BOZCAADA RES | Zero production and zero forecast for the entire period — not ranked |
| ALAÇATI RES(EÜAŞ) | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| DİKİLİ RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| EMRES RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| FENER RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| GELGİT RES | No earlier settlement history for this unit, so its operating level cannot be validated — not ranked this period |
| GÖKDAĞ RES(İLETKEN ENR.) | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| KORUDAĞI RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| MADRANBABA RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |
| MİSKEVANK RES | Imbalance ratio above our 75% review threshold — not assessable from public data, so not ranked |
| PAŞALİMANI RES | Generation below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked |
| R3-TRABZON-1 RES | Output well below this unit's own recent operating level — its ratio is not comparable with normally operating plants, so not ranked |
| SARAY DÖKÜM RES | The published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked |