Select a plant from the dropdown above to view its performance detail and organisation history.
The costs in this report are derived from data published on the EPİAŞ Transparency Platform. They reflect the financial value, as imbalance charges and KÜPST, of the difference between each plant's final production plan (KUDÜP) and its settled generation (UEVM). This cost does not depend on forecast performance alone: nomination strategy, portfolio management decisions, maintenance and outages, curtailment and balancing instructions (YAL/YAT) and system direction all shape the final figure, and public data cannot separate these effects. The report is therefore not, on its own, a sufficient basis for assessing the performance of individual plants or portfolios.
57 Plants Reporting
0.25 GWh Generation This Month
37.2 M TL Imbalance Cost This Month
25.6% Median Imbalance % +13.0pp vs vs prev. month
179 TL/MWh Sector Unit Cost

Plant Ranking – October 2026

Plant Imbalance (%) Unit Cost (TL/MWh) Generation (MWh) Total Cost
GÜN GÜNEŞ ANTALYA AKSEKİ BÜYÜKALAN 1 GES 16.9% 104.78 3,520 368,804
FERNAS-4 GES 18.1% 116.24 3,625 421,393
CINGILLI GES 19.0% 134.75 4,357 587,099
KÜÇÜKKÖY GES 19.0% 142.37 3,363 478,845
APA GES 19.0% 144.73 1,723 249,305
TEKSİN GES 19.1% 127.74 4,601 587,662
G24-KÜTAHYA GES 19.3% 136.75 6,448 881,820
MT GES 19.5% 129.40 1,431 185,174
G4-BOR3 GES 19.5% 123.98 16,755 2,077,311
EDİKLİ GES 21.1% 161.80 1,598 258,486
G4-BOR2 GES 21.3% 146.13 16,554 2,419,009
ÖZMEN-1 GES 21.8% 162.96 2,518 410,319
G4-ERZİN-1 GES 22.3% 165.42 14,074 2,328,104
ME-SE GES 22.5% 165.85 1,336 221,582
ALİBEYHÖYÜĞÜ GES 22.6% 168.51 2,703 455,433
DENİZLİ TAVAS GES 22.7% 136.21 706 96,173
ÖZGÜÇLÜ GES 22.8% 156.38 1,601 250,359
G4-VİRANŞEHİR-8 GES 23.5% 175.38 6,753 1,184,387
TAŞKESİĞİ GES 24.0% 135.73 1,448 196,509
OMİCRON ERCİŞ GES 24.0% 157.88 1,286 203,109
SERRA GES 24.1% 169.87 846 143,703
G4-VİRANŞEHİR-5 GES 24.3% 191.66 6,777 1,298,858
G4-VİRANŞEHİR-7 GES 24.3% 194.15 6,860 1,331,933
G4-ERZİN-2 GES 24.8% 176.21 13,502 2,379,281
G4-VİRANŞEHİR-1 GES 24.9% 202.89 6,349 1,288,199
YAYSUN GES 24.9% 140.20 1,317 184,642
OMİCRON ENGİL208 GES 25.1% 159.01 1,256 199,757
G3-GAZİANTEP-1-1 GES 25.5% 168.45 3,017 508,223
G4-BOR-1 GES 25.6% 166.00 15,338 2,545,965
G3-GAZİANTEP-3-1 GES 25.8% 170.80 1,483 253,332
G24-MALATYA GES 26.0% 175.87 12,041 2,117,595
GÜN GÜNEŞ VAN ARISU GES 26.3% 199.38 6,492 1,294,310
SOLENTEGRE GES 26.4% 166.18 878 145,936
PSİ ENGİL207 GES 26.5% 177.57 1,418 251,774
KIVANÇ-2 GES 27.2% 166.81 6,190 1,032,518
METGES BURDUR GES 27.3% 199.01 1,045 208,053
G4-VİRANŞEHİR-6 GES 27.4% 212.07 7,721 1,637,504
İOTA M. FIRINCI GES 27.7% 153.87 1,223 188,113
GİTAŞ-1 GES 27.8% 241.38 1,473 355,479
G3-GAZİANTEP-2-1 GES 27.9% 197.21 2,927 577,338
RA GÜNEŞ MARDİN GES 28.3% 195.53 1,249 244,171
ALİBEY GES 28.8% 223.64 849 189,866
SİLOPİ GES 29.0% 198.89 1,043 207,370
G4-VİRANŞEHİR-10 GES 29.5% 236.42 7,921 1,872,616
G4-VİRANŞEHİR-2 GES 29.8% 226.56 7,749 1,755,677
BÜGET GES(ULUDER) 30.0% 217.73 1,286 280,003
G4-VİRANŞEHİR-3 GES 30.1% 252.87 6,532 1,651,813
G3-AĞRI-2-2 GES 30.4% 192.11 1,876 360,422
G3-AĞRI-1-2 GES 30.6% 201.06 1,911 384,303
BÜGET GES(KAROMAD) 31.0% 217.29 1,029 223,698
HAMAL GES 31.2% 248.35 1,145 284,413
G4-VİRANŞEHİR-4 GES 33.0% 245.45 6,404 1,571,921
ALAGES ADİLCEVAZ GES 33.3% 263.60 2,254 594,286
AFTA GES 34.8% 333.45 1,637 545,777
G4-VİRANŞEHİR-9 GES 35.3% 251.10 6,551 1,645,033
HALK ENERJİ ERZURUM GES 38.8% 293.27 515 150,994
RENOE ACIPAYAM GES 39.1% 226.32 1,077 243,830

Operators who believe a figure for their plant is incorrect can request a review through the Algopoly report page.

Notes on individual plants

These notes state what the published data shows about a plant's month. They do not explain why it happened, because public data cannot establish that.

  • G24-MALATYA GES: this is the first full period for this unit in the report.

This dashboard is built on publicly available settlement data from EPİAŞ (Turkish Energy Exchange). The metrics below explain exactly how each figure is computed.

Data Source
All production, imbalance, and KÜPST figures are drawn from the EPİAŞ Real-Time Settlement (Gerçek Zamanlı Uzlaştırma / GZU) reports. Data is fetched at hourly resolution via the public EPIAS Transparency Platform REST API (eptr2) and aggregated to monthly plant-level summaries. The dataset covers all licensed solar (GES) or wind (RES) power plants that reported at least one hour of production in the analysis period.
Imbalance Ratio (%)
The imbalance ratio measures how much a plant's hourly generation deviates from its day-ahead schedule, relative to what it actually produced. For each hour we take the absolute difference between the forecast (KÜDÜP) and the actual settlement quantity (UEVM), sum these over the month, and divide by total actual generation:
Imbalance % = Σ |KÜDÜP − UEVM| (hourly) ÷ Σ UEVM (monthly) × 100
Because the hourly differences are taken in absolute value, over-production hours and under-production hours do not cancel out — both count as imbalance. The metric therefore captures hourly forecasting volatility and is scale-independent, so plants of different sizes compare fairly. The separate net imbalance (signed sum, where surplus and deficit hours offset) is typically much smaller and is reported as a distinct figure.
Imbalance Cost
Imbalance cost arises when a plant's actual hourly generation differs from its day-ahead schedule. Settlement is system-direction-dependent: positive imbalance (plant produced more than scheduled) is settled on min(MCP, SMP); negative imbalance (produced less) on max(MCP, SMP).
  • Until Dec 2025 — flat 3% margin: positive at min(MCP, SMP) × 0.97, negative at max(MCP, SMP) × 1.03.
  • From Jan 2026 (EPDK regulation, Official Gazette 29/12/2025) — the margin depends on whether the plant's deviation aggravates or relieves the system. A deviation in the same direction as the system imbalance is charged 6% (positive × 0.94, negative × 1.06); a deviation that helps the system keeps the 3% margin (positive × 0.97, negative × 1.03).
Figures use EPİAŞ's published hourly imbalance prices, which already embed the applicable system-direction coefficient. The reported monthly value is the total imbalance cost (TL) — every hour is charged on the absolute size of its own deviation, so over- and under-forecast hours add up rather than cancel out.
KÜPST Cost
KÜPST (Kesinleşmiş Üretim Planından Sapma Tutarı — deviation-from-final-schedule charge) is a penalty applied hour by hour, whenever an hour's deviation from the final schedule (KUDÜP) exceeds a regulatory tolerance band set as a share of that hour's schedule:
  • Solar (GES): 8% of the hour's KUDÜP (10% before Jan 2026)
  • Wind (RES): 15% of the hour's KUDÜP (17% before Jan 2026)
The KÜPST unit price is 5% of max(MCP, SMP, 750 TL/MWh) for the relevant hour from January 2026 (3% until December 2025). Only the portion of an hour's deviation that exceeds the tolerance band attracts the penalty; the monthly figure is the sum over all hours.
Unit Cost (TL/MWh)
Unit cost = (Total Imbalance Cost + Total KÜPST Cost) ÷ Total Generation for the month, expressed in TL/MWh. It provides a scale-independent measure of settlement efficiency, allowing fair comparison across plants of different capacity.
Plant Rankings
Plants are ordered by their monthly imbalance percentage: the sum of absolute hourly differences between the published forecast (KUDÜP) and settled generation (UEVM), divided by generation, × 100. Hours do not offset each other. The figure reflects forecasting but also curtailment, outages and balancing instructions, which public data cannot separate, so it is not a measure of forecast skill alone. Differences between neighbouring plants are largely statistical noise, so the public table lists plants in order without rank numbers. Plants whose data does not allow a fair comparison (for example a partial month, very low generation, output far below the unit's usual level, or a day without a published forecast) are not ranked and are listed with the reason.
Coverage & Exclusions
A plant is excluded from a given month's ranking — while remaining in the registry — in either of these cases:
  • Zero activity: the plant reported zero generation and zero forecast for the whole month.
  • Insufficient forecast coverage: the plant has both a forecast and an actual value for less than half of the month's hours — typically a unit commissioned or registered mid-month. Its imbalance ratio would not be comparable with a full-month plant, so it is listed rather than ranked.
Every excluded plant is listed below with its reason.

KARAPINAR YEKA-1 (approx. 1,365 MW) is excluded from the plant statistics due to its outsized scale. Its performance is reported separately.

Plants excluded this month

ELAZIĞ HİBRİT BES/GESZero production and zero forecast for the entire period — not ranked
SARUHANLI-1 GESData covers only 408/744 hours of the period — not comparable with a full-period plant, so not ranked
ALIÇ GESForecast and actual both available for only 194/744 hours — not comparable with a full-period plant, so not ranked
ALİAĞA-1 DEPOLAMALI GESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
ARTUKLU-1 GESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
IĞDIR DGESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
LÜM_İLETİM_GÜLSAN GES_5.1.H(ST)_GÜNEŞThis unit is settled under the separate regime for transmission-connected unlicensed plants, which applies a different tolerance band. Its monthly ratio is not comparable with the plants in this ranking, so it is not ranked.
NEPSUN HADİM GESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
OZE DEPOLAMALI GESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
PAMUK GESNot ranked under our policy for storage-integrated and balancing-market units, whose deviations cannot be separated from balancing instructions using public data
SOLANA KONYA GESGeneration below 500 MWh for the period — too small for a reliable imbalance ratio, so not ranked
TOZOR GESThis unit has fewer than 3 earlier months of settlement data. There is not yet enough history for a comparable monthly figure, so it is not ranked.
YENİ GESThe published forecast (KUDÜP) is zero on at least one day with production — the monthly ratio is not comparable with plants forecast every day, so not ranked
This report is based entirely on publicly available data published by EPİAŞ. All figures are derived from open settlement data; Algopoly accepts no liability for decisions made based on this content.